Refurbishment of High Pressure LPG Furnace Maximum Temperature 1100C

Photograph shows a new furnace.

The following restorative works will be undertaken to bring your furnace back up to standard:

  1. Gas jet cleaned
  2. Gas pipe blown through with high pressure hose
  3. Gas pressure leak test
  4. Flame failure device test
  5. Removal of slag and damaged brick from lid and furnace
  6. Picking out all cracks for ingress of alumina fire cement
  7. Re -cooncrete bottom
  8. Fill all cracks allow to dry
  9. Cover all working surfaces with alumina fire cement (If Required)
  10. Assembly and test fireing to temperature

If you have any questions give me a call or email whichever is easiest.

 