**** European Shipping ****
All orders are shipped (DDU) Delivered Duty Unpaid and means the receiver/customer will get contacted by customs once their shipment arrives, and will have to settle any charges in order for customs to release the shipment and have it delivered.

Please note there is a 5 to 6 week waiting list from placing Furnace and Tong orders until their dispatch due to demand. Store closures periods do not count as part of this wait time.

 

These items are made to order and it is a 2 to 3 week wait.

Moulding boxes hold the sand when a mould is being made. Accurate positioning of the cope (top box) onto the drag ( bottom box) is possible due to tapered start then parallell alignment pin finish. Our moulding boxes are precision made to exact tolerances. As they are made to order they have a 4 to 6 week delivery window. Moulding box pins should be regularly lubricated with graphite and should never be hit with hammers or mallets as this will misallign them. When Knocking out the moulding boxes the boxes themselves and pins should not be hit as this can knock them out of square and damage the mating faces. They are fitted with two bar loop handles. Box faces are ground level and parallel. The above sizes are nominal.