**** We are back open again! ****
Some of our suppliers are having problems with stock so you may be asked to phone up before checkout to check stock levels
We still have a 6 to eight week lead time for tongs and furnaces as they are made to order.

Please accept our apologies for any inconvenience caused. We are not Registered for VAT

Available in most sizes to order contact us for details. This is suitable for a A12 or A16 crucible.

If a lid is used on a crucible it has the following advantages:

  • Retains the heat and heats up quicker.
  • Prevents fresh oxygen contacting the metal surface and reduces slag oxides.
  • Prevents inclusions dropping in if fuel is charcoal or coke

Tongs are used for removal.