**** We are back open again! ****
Some of our suppliers are having problems with stock so you may be asked to phone up before checkout to check stock levels
We still have a 6 to eight week lead time for tongs and furnaces as they are made to order.

Please accept our apologies for any inconvenience caused. We are not Registered for VAT

Pouring Hoop / Cradle for A16 Crucible (Other sizes available) has been added to your Cart

These items are made to order and it is usually a 2 to 3 week wait.

Moulding boxes hold the sand when a mould is being made. Accurate positioning of the cope (top box) onto the drag ( bottom box) is possible due to tapered start then parallell alignment pin finish. Our moulding boxes are precision made to exact tolerances. As they are made to order they have a 4 to 6 week delivery window. Moulding box pins should be regularly lubricated with graphite and should never be hit with hammers or mallets as this will misallign them. When Knocking out the moulding boxes the boxes themselves and pins should not be hit as this can knock them out of square and damage the mating faces. They are fitted with two bar loop handles. Box faces are ground level and parallel. The above sizes are nominal.